TAMAN PERINDUSTRIAN K.I.P. KEPONG
Due to change of uses, the consultant called to strengthen the column by CFRP fabric.
DOUBLE STOREY SHOP, RASAH JAYA, SEREMBAM
The core test shows the slab & beam were under strength and the owner decided to rectify the deficiency by Carbon Fiber Reinforced Polymer system.
JING LOONG SHAN WAN FO SHIH, SERENDAH
This newly built 5-storey temple consist of 3-storey above ground and 2-storey basement. Many cracks appear on Level 1's beam and cores sample have been taken for engineer’s inspection.
TOUCH N GO CORPORATE HQ & HUB, THE SPHERE, U.O.A., BANGSAR SOUTH, KUALA LUMPUR.
To increase floor area by putting up a mezzanine floor using structural steel.
Due to the increase of load, all relevant beams required to increase their load carrying capacity by using CFRP system.